Leggari products simplifying the industry having.
Install proper metallic epoxy flooring.
Easy to apply and endless options for colors and patterns.
When the floor system is applied and the installer s work completed there will still be movement in the product caused by the natural flow of the concrete and the pull of gravity.
Some epoxy floor coating systems provide colored flakes which are scattered as the second layer of coating is applied to create speckled patterns in the surface.
Cosmetically metallic floors are beautiful with the color disbursements three dimensional looks and effects that transpire from install to dry.
Normally installed as a 3 layer system of contrasting pigmented epoxy primer 100 solids clear epoxy with metallic pigment additive and clear protective topcoat.
Prep your floor by grinding or etching.
You need a flat clean surface preferable concrete.
Preparing the substrate preparation of a metallic epoxy floor does not differ much from any other type of epoxy flooring.
Next we apply a colored base coat to compliment the metallic epoxy.
The basic principles are the same.
The price itself is pretty affordable but considering all the advantages it has.
Make sure you have ground the surface so it can be ready.
Pre tinted and metallic epoxy floor coatings expand decorating options especially when it comes to stylish flooring inside and outside living areas.
Check out this video and learn how to install epoxy floors like the pros do.
First we apply a primer to the concrete allowing our epoxy to chemically bond with the surface.
This makes a metallic floor a wonderful option for a wide variety of in house working areas be they for carpentry or car repair.
To put an epoxy coating on a garage floor first prepare the floor by removing any previous coatings stains or residues so that the epoxy will be able to tightly bond to the surface.
You can change the look of your home office or retail floor by using the metallic epoxy floor system from epoxy plus.
Then etch the floor with muriatic acid or a masonry cleaner and allow the floor to dry completely for 7 to 10 days.
Epoxy plus designer epoxy ep e100 is.
Time for a floor remodel.